WebLogic server membership

  • Follow a desired cluster size through operator reconciliation to managed-server Pod readiness.
100%

WebLogic domain provisioning and operator reconciliation

Who starts a managed server?Select / reconcileRead / supplywrite configread configas requireddesired countreconcilewhen enabledWLST setupDomain topologyDomain homePersistent volumeIntrospection JobDiscover topologyDomain v9 + Cluster v1Requested membershipWebLogic operatorReconcile resourcesServer PodKubelet starts containersUpload progressFirst claim to completionwrite configread configas requireddesired countreconcilewhen enabled

Select a component to trace its direct connections. Drag to pan · Ctrl + wheel or pinch to zoom.

  • WLST, the WebLogic Scripting Tool, provisions the domain configuration. The operator uses the declared Domain and Cluster resources to reconcile Pods with that configured topology.
  • For FileUpload, inspect when the Pod was created, when the managed server became ready and when it completed its first upload. Each milestone has a different owner.
  • WLST configures server targets in the domain home. The operator reconciles running members against the Domain and Cluster resources. LoanTransaction had one ready managed server.
  • A FileUpload member can poll for work after init succeeds, the server starts and the servlet initializes.
  • Watch desired membership, ready servers and completed business work as three separate measures.
WebLogic server membership

WebLogic server membership

WebLogic Kubernetes Operator 4.2.16 · Domain v9 · Cluster v1

Separate provisioned topology from desired membership

  • Offline WLST creates the initial domain home. Online cluster configuration subsequently targets applications, JDBC/JMS resources and Work Managers through the Admin Server.
  • The v9 Domain references a Kubernetes Cluster resource. Its spec.clusterName identifies the WebLogic cluster already configured in the domain home. The operator watches requested membership and reconciles server Pods.
  • Introspection can discover domain topology when reconciliation requires it. The operator controls the Pod specification and Kubernetes schedules the Pod and runs its declared init sequence.
  • The earlier v8 Domain shape embeds cluster settings. Check the installed CRD before reusing a configuration fragment. Oracle Domain and Cluster resources · Operator 4.2.16.
Illustrative FileUpload Cluster declarationyaml
# Illustrative WKO 4.2.x Cluster declaration for a scale-from-zero test.
# Prerequisites: WKO and CRDs installed, watched namespace, an existing v9
# Domain referencing lab-upload, a provisioned domain home with FileUpload
# configured, and accessible compatible images, credentials and mounts.
apiVersion: weblogic.oracle/v1
kind: Cluster
metadata:
  name: lab-upload
  namespace: lcm-example
  labels:
    weblogic.domainUID: lab-host
spec:
  clusterName: FileUpload
  replicas: 1
# Here the operator reconciles one FileUpload member from the requested replica count.
# Inspect desired/current/ready status and init exit reasons separately.

Diagnose where membership stopped

  • If the Domain omits the intended Cluster resource, correct its reference before expecting server membership to change.
  • If a member Pod exists but init work stalls, check the failing image, mounted target and copy step. WebLogic can start only after init completes.
  • If the managed server is running but receives no application traffic, check its readiness and configured application targets.

Check all three transitions before increasing consumers

  • Confirm the authority that changes replica intent. An alert, the custom scaling resource and a requested count each describe different stages.
  • If desired exceeds ready, inspect operator events, placement, image resolution, init status, mounts and server startup. Additional replicas can repeat the same failed initialization.
  • If members are ready but offer backlog grows, inspect poll/claim progress, JDBC wait, broker lag and CP completion before scaling. One more JVM starts another timer and consumes part of the same downstream budget.
  • Run a bounded zero-to-one rehearsal with synthetic input. Record time to ready, first successful claim and terminal business outcome. Choose scale thresholds from those measurements.